How to Fill Out the Washington Mobile Food Unit Application (King and Pierce County, 2026)
A field-by-field walkthrough of the mobile food unit plan review application in Seattle and Tacoma: King County's Appendix B packet, Tacoma-Pierce's 62 Mobile Unit Questions, the commissary and restroom agreements, the reciprocity shortcut, and the 2026 fees.
This walks the actual application, field by field. For everything around it — the city business licence, fire permit, street vending and total cost — start with the Seattle food truck permit guide or the Tacoma food truck permit guide. For the statewide picture, see how to start a food truck in Washington.
Step 1 — Work out which document you are actually filling in
The form depends on the county health jurisdiction, not on the state. Washington writes the food code (chapter 246-215 WAC); each health jurisdiction writes its own paperwork, the same split as North Carolina's county-by-county application.
| Seattle — Public Health – Seattle & King County | Tacoma — Tacoma-Pierce County Health Department | |
|---|---|---|
| The application | Plan Review Application for a Mobile Food Service Unit (Appendix B) | Food Establishment Application (2 pages) |
| Mobile-specific form | Mobile Food Unit Operational Questionnaire (Appendix J, 20 questions) | Mobile Unit Questions (62 questions, Rev. Aug 2026) |
| Where you file | Public Health Permit Center, online | Accela Citizen Access online, in person by 4 p.m., or by mail |
| Review time | "up to 8 to 10 weeks" for initial review, per the county | Goal of 10 business days to approve or ask questions |
| L&I insignia | Sticker number required on the application | Tag photo required before final approval |
| Commissary location | Within King County | In Pierce County, with an active commissary permit |
In both counties, plan approval comes before you build, remodel or buy a unit, and the finished unit is inspected before the annual permit is issued. If you only want to sell at a single event, TPCHD points you to a temporary food permit instead: one place, one public event, up to 21 days in a row.
Step 2 — Get the L&I insignia sequencing right
Every occupied mobile unit (a truck or trailer you work inside) needs Washington Department of Labor & Industries approval of its body, plumbing, heating and electrical work. The counties sequence it differently, and that difference decides when you can file.
- King County: Appendix B lists
WA L & I Sticker #under Required Information, next toWA License Plate #andVIN #. Appendix G tells you to obtain the L&I inspection and seal prior to your plan review. The packet gives the L&I Plans Examiner's number as (360) 902-5222. - Tacoma-Pierce: item 16 on the Plan Review Checklist asks for a photo of the L&I tag if already approved, and says it is required before final approval. The Mobile Unit Requirements add that an occupied unit must be L&I-approved before TPCHD will complete the pre-opening inspection.
So in Tacoma you can file plan review while L&I is in progress; in Seattle you cannot usefully file without the sticker number.
Step 3 — Seattle: King County's Appendix B, line by line
Appendix B is one page. The rest of the 17-page packet is the attachments it depends on, and the county will not accept the package for review until all ten are in.
Operation Information.
Operation Name (Doing Business As).Mobile Unit Operating Location: Single Site or Multiple Sites/Route. If you tick Multiple, you must include all locations with the submittal.Scope (Briefly describe operation/menu style).Former Name.Unit Type: Cart, Vehicle, Trailer or Movable Building.Required Information: WA licence plate number, VIN, and WA L&I sticker number.
Plan Review Submittal Fee. Three tick boxes: New Operation, Mobile changes, Resubmitted Plan. The fee is non-refundable and cheques are payable to SKCDPH. See Step 7 before you write the amount.
Ownership Information. Are you the new owner? Yes or No, then name, business entity (Corp, LLC, etc.), mailing address and phone numbers.
Applicant Information (if different from owner). The contact person or agent who will answer the plan reviewer's questions.
Commissary Information. Business name, address, owner or contact, phone, and Sewage: Sewer or Septic System.
Restroom Information. The same fields again for the restroom you will use. The form states you must provide a restroom availability letter for each stop that lasts longer than 1 hour.
The ten items the package must contain:
- The Appendix B application.
- Floor plans of the unit. Front, back and side views. For an occupied unit, add scale drawings of the interior with dimensions, every piece of equipment located, surface materials, and the make and model of each piece of equipment. Appendix A also asks for a drawing of the water system: tanks, water heater, pump, tubing, waste connection and sinks. If the unit is already built, add photos of the inside, the outside, all equipment and the L&I sticker.
- The Use of Commissary / Shared Kitchen Agreement (Appendix C), plus a drawing of the commissary showing the equipment and storage you will use.
- The Food Preparation Flow Chart (Appendix D).
- The Use of Restroom Agreement (Appendix E).
- The Contact Information for Route or Site Location form (Appendix F).
- A detailed menu, including where you buy anything you do not make yourself. The plans must carry this exact statement: "NO CHANGES WILL BE MADE WITHOUT PUBLIC HEALTH – SEATTLE & KING COUNTY APPROVAL."
- The Mobile Operational Questionnaire (Appendix J).
- The plan review fee.
- The Mobile and Limited Plan Review Cover Sheet (Appendix H), placed on top.
Appendix D, the flow chart, is two grids. The first lists each menu item and ticks every step done at the commissary: thaw, cut/assemble, cook/bake, cool, cold holding, reheat, hot holding, portion/package, storage. The second ticks every step done on the unit: cold holding, cook/grill, reheat, hot holding, assemble, other. Up to ten items per grid; add a sheet if your menu is longer.
Appendix J, the questionnaire, asks how often the unit returns to the commissary, your hours at the commissary and at the sales site, where you fill and empty tanks (with the make and model of the drinking-water hose), how cold food stays at 41°F or less and hot food at 135°F or higher in transit, how the unit is powered on site, what happens to leftovers, and where the unit is stored overnight. Three answers are fixed in advance: reusable customer utensils are not allowed, all hot food is discarded at the end of the day, and no hot food is cooled on the unit.
Step 4 — Tacoma: the TPCHD application and the 62 Mobile Unit Questions
Tacoma's process uses the same plan review packet as a restaurant, plus mobile-only forms. The Plan Review Checklist (Rev. 4/15/26) lists 17 items, in this order:
- Food Establishment Application, plus a copy of your Washington State Business License.
- Water verification. 3. Sewer/septic verification. 4. Plan Review Questions.
- Floor plan. 6. Equipment list, numbered to match the floor plan, commercial grade (NSF or equivalent) only.
- Finish schedule. 8. Menu, including specials and seasonal items. 9. Food sources. 10. Food preparation steps. 11. Waste disposal form.
- Supplemental questions (for you, the Mobile Unit Questions). 13. The fee.
- Commissary Kitchen Agreement. 15. Sales Site Agreement for each stop over one hour. 16. L&I tag photo. 17. The commissary's floor plan, equipment list, finish schedule and water/sewer approval.
The Food Establishment Application is two pages. Page 1 asks for the opening date, facility details, the commissary address and parcel number, Are you the owner of the commissary?, the owner's corporation and individual names, the UBI number, whether you own other food establishments in Pierce County, where to send invoices, and a plan review contact. Page 2 is an hours grid for each day of the week, Annual or Seasonal, and your signature.
The form prints a warning worth taking literally: "Double check your UBI. A change in UBI requires a new application, fee, and permit." If you are about to form an LLC, form it first and apply under the LLC's UBI.
The Mobile Unit Questions (Rev. Aug 2026) are the heart of the Tacoma review. They run in this order:
- Questions 1–19, the unit and its sites. Attached floor, walls and ceiling (open-air trailers and tents are not allowed), the VIN, whether all equipment is permanently attached, whether you run a route (if yes, include a sample route), how many sales sites, a Sales Site Agreement for each one of an hour or more, restroom access and whether it needs a key, seating, daily return to the commissary, and a location plan for customers and your inspector, which can be a website or social media page.
- Questions 20–31, menu and refrigeration. How the menu is displayed, every cold beverage and where it is kept cold, whether you serve anything raw or undercooked, every raw meat cooked on the unit, how condiments are served, utensil sets and washing, whether all refrigeration is commercial grade, at least 2 refrigeration units, and a prep table if you make food to order.
- Questions 32–50, power, water and waste. How hot and cold holding is powered in transit (gas generators are not allowed while moving), hand sink dimensions, mixing faucet, the water pump's make and model and whether it pressurises to 15 psi and switches on automatically, the water heater's size, make and model, three-compartment sink dimensions, tank sizes, where you fill and empty them, trash, overnight food storage, and leftovers.
- Questions 51–56, trucks and trailers only. L&I approval, a three-compartment sink with drainboards on both ends, compartments big enough for your largest equipment, a faucet that reaches every compartment, and enough hot water to fill two compartments at 100°F without the hand sink dropping below 100°F.
- Questions 57–62, carts only. A pre-cooked menu, a sneeze-guard diagram (vertical guards at least 60 inches from the ground), and how the cart is transported and kept clean.
One inconsistency to know about: Question 41 says freshwater tanks must be at least 35 gallons for all mobile food units, while TPCHD's Mobile Unit Requirements set 5 gallons for a cart. If you are permitting a cart, confirm the figure with TPCHD before you buy a tank.
Step 5 — The commissary and restroom agreements
Both counties want a signed commissary agreement from the kitchen's owner, and both treat it as non-transferable: if either party changes, the agreement and potentially your permit fall away.
King County, Appendix C. The commissary must be an approved facility within King County, with at least a 3-compartment sink, a mop sink and a hand wash sink, and an indirectly drained food prep sink if you wash produce there. You tick which services you may use (dry storage in square feet, refrigeration, freezer, ice machine, cooking equipment, overnight truck parking, key access) and attach a scale drawing of the commissary. Changing commissary later costs $25.
Tacoma-Pierce, Commissary Kitchen Agreement. Most units need a commissary in Pierce County, and the kitchen must already hold an active commissary permit or TPCHD will not accept your application. The minimum services are potable water, wastewater disposal, garbage disposal, restroom access, a 3-compartment sink with drainboards at each end, a mop sink and a hand sink. Refrigeration and freezer space are stated in cubic feet.
Restrooms. Both counties require a plumbed restroom within 500 feet for any stop over an hour. King County's Appendix E needs hot water at 100°F or above, soap, towels and a handwashing sign, and a copy must be kept on the unit. Tacoma's Sales Site Agreement covers the same ground and adds whether electricity, potable water, wastewater disposal and overnight storage are available at the site. If you offer customer seating, King County's Appendix E and Appendix A say a plumbed customer restroom within 500 feet; the Appendix J questionnaire says 200 feet. Plan for the stricter figure.
Step 6 — The numbers both counties check on the unit
These come from the counties' requirement sheets, and they mostly agree.
| Item | King County | Tacoma-Pierce |
|---|---|---|
| Hand sink | About 10 × 10 × 6 in, warm water 100–120°F, at least 5 gallons of fresh water for handwashing | At least 10 × 10 × 5 in, not under a counter, 100°F or more |
| Fresh water tank | At least 5 gal for handwashing, plus enough for the 3-compartment sink's cleaning needs if you have one | 35 gal minimum (truck, trailer); 5 gal for a cart |
| Waste water tank | At least 15% larger than fresh | At least 15% larger than fresh, 42 gal minimum (cart: 6 gal) |
| 3-compartment sink | Required on all occupied units | Required on occupied units, with drainboards both ends |
| Refrigeration | Commercial-grade mechanical, below 41°F | At least 2 units, plus a prep fridge for made-to-order food |
| Cart size | 3 × 6 ft body, two wings of 18 in max | Same |
| Name on unit | — | Letters at least 4 inches high |
Both counties also require food-grade tanks, tubing and fill hoses, a leak-free waste connection that you empty only at the commissary or another approved site, and a garbage container on the unit. TPCHD adds a pump that pressurises to 15 psi and switches on automatically.
Step 7 — What you actually pay in 2026
King County. The Appendix B form in the September 2025 packet prints $972 + $243/hr after 4 hours for a new operation. The county's 2026 Food & Facilities Program Fees sheet replaces those rates:
| Charge (King County, 2026) | Fee |
|---|---|
| New plan review (4-hour base) | $1,008 + $252/hr after 4 hours |
| Changes to an existing mobile unit | $504 + $252/hr after 2 hours |
| Resubmitted plans | $252/hr |
| Annual mobile food unit permit | $630 Risk 1 · $1,008 Risk 2 · $1,260 Risk 3 |
| Commissary change | $25 |
The permit year runs 1 April to 31 March, and a first-year permit is prorated: 100% before 1 July, 75% before 1 October, 50% before 1 January, and 25% from 1 January. Late renewals add 10%, 20% or 30% of the annual fee. The county's mobile permit page also warns that opening without the pre-operational inspection can bring fees including 50% of the annual permit fee.
Tacoma-Pierce. Fees are set by Board of Health Resolution No. 2025-4903, adopted 3 December 2025, effective 1 January 2026, and itemised on TPCHD's Food Safety Program 2026 Fees sheet in the plan review packet:
| Charge (TPCHD, 2026) | Fee |
|---|---|
| Plan review, new (per permit) | $1,140 |
| Plan review, change of commissary | $960 |
| Resubmittal | $240/hr (1-hour minimum) |
| Variance review (required for an unoccupied unit) | $720 (3-hour minimum) |
| Pre-opening inspection | $360 |
| Annual mobile food unit permit | $900 high risk · $240 low risk |
| Opening without a pre-opening inspection | $420 |
TPCHD's fee sheet has no separate mobile plan review line, so confirm with Plan Review on (253) 649-1706 which line your unit falls under. Starting construction without plan review approval costs double the plan review fee. Permits expire 31 January each year. Late invoices add 25% at 1–30 days, another 25% at 31–60 days, and at 61 days you are subject to closure.
Step 8 — Already permitted in one county? Use reciprocity
RCW 43.20.149 requires every Washington health jurisdiction, since 1 May 2020, to accept another jurisdiction's approved mobile food unit plan review if you hold a valid permit there. You supply four things: the current operating permit, the complete approved plan review, the most recent inspection report showing compliance, and your commissary agreement. The second county may also ask for restroom agreements, and for an extra commissary agreement unless you are exempt or return to your approved commissary daily. It may charge its annual permit fee but not a plan review or inspection fee.
Tacoma-Pierce's Mobile Unit Plan Review Reciprocity Checklist (Rev. Dec 2024) turns that into a list: the Food Establishment Application and business licence, the approved plan documents (menu and prep steps, floor plan, equipment list, finish schedule, water and plumbing specs, wastewater site, restroom location, operating procedures, cleaning schedule), the approval letter, the L&I approval, the primary county's permit, and its latest routine inspection report. A pre-opening inspection report does not count. You pay a processing fee, skip the pre-opening inspection, and book an appointment for the permit sticker. Reciprocity does not transfer to a new owner. King County has an equivalent Mobile Approval by Reciprocity Checklist.
The five that actually get Washington applications rejected
- Prep steps on the wrong side of the flow chart. Knife work or produce rinsing that the county reserves for the commissary, cooling cooked food on the unit, or keeping hot food for tomorrow. Both counties forbid the last two outright.
- Paying the fee printed on the form. King County's Appendix B still prints 2025 rates. A new unit pays $1,008 in 2026, not $972.
- A commissary that cannot be approved. Outside King County for a Seattle unit, or a Pierce kitchen without an active commissary permit. TPCHD will not accept the application.
- No agreement for a long stop. Every stop over an hour needs a restroom agreement (King County) or a Sales Site Agreement (Tacoma) with a plumbed restroom within 500 feet.
- Tanks that do not clear 15%. A 35-gallon fresh tank needs at least 40.25 gallons of waste capacity, and Tacoma's floor is 42.
Sources: Public Health – Seattle & King County, Mobile Food Unit Plan Review and Permitting Guide, September 2025 (official, Appendices A–J) · King County Plan Review Application for a Mobile Food Service Unit (Appendix B) · King County Food & Facilities Program Fees, 2026 · King County mobile food business permit · TPCHD Food Establishment Plan Review packet (packet Rev. Dec 2025; checklist Rev. 4/15/26) · TPCHD Mobile Unit Requirements, Rev. Jan 2026 · TPCHD Food Establishment Application · TPCHD 2026 Fee Schedule, Resolution No. 2025-4903 · TPCHD Mobile Unit Plan Review Reciprocity Checklist, Rev. Dec 2024 · RCW 43.20.149 · King County Environmental Health 206-263-9566 (Downtown) or 206-477-8050 (Eastgate) · TPCHD Food Safety (253) 649-1706. Verified 2 October 2026.
Frequently asked questions
- Is there one statewide Washington food truck application form?
- No. Washington's Retail Food Code (chapter 246-215 WAC) is statewide, but each local health jurisdiction publishes its own application. In Seattle you fill in Public Health – Seattle & King County's Plan Review Application for a Mobile Food Service Unit (Appendix B of a 17-page packet dated September 2025). In Tacoma you fill in the Tacoma-Pierce County Health Department's Food Establishment Application plus a 62-question Mobile Unit Questions form. The questions overlap because the rules are the same, but the forms are not interchangeable.
- How much is the mobile food unit plan review fee in King County in 2026?
- For a new mobile unit, King County's 2026 fee schedule sets the new plan review at a 4-hour base of $1,008, plus $252 for each hour after 4. Changes to an existing mobile unit are $504 plus $252 an hour after 2 hours, and resubmitted plans are $252 an hour. The Appendix B form itself still prints the older $972, $486 and $243 figures, so pay from the 2026 schedule. The annual mobile food unit permit is separate: $630, $1,008 or $1,260 for Risk 1, 2 or 3.
- How much does a mobile food unit permit cost in Tacoma-Pierce County?
- Tacoma-Pierce County Health Department's 2026 fees, adopted 3 December 2025 and effective 1 January 2026, are $900 a year for a high-risk mobile food unit and $240 for a low-risk one. Plan review is charged per permit and the fee sheet has no separate mobile line: a new establishment is $1,140, a change of commissary is $960, and the pre-opening inspection is $360. Call TPCHD at (253) 649-1706 to confirm which plan review line your unit is billed under before you pay.
- Can I use my King County approval to get a Pierce County permit?
- Yes, through plan review reciprocity. Under RCW 43.20.149, since 1 May 2020 a Washington health jurisdiction must accept another jurisdiction's approved mobile food unit plan review if you hold a valid permit there. You supply the current permit, the approved plan review, the latest inspection report and your commissary agreement. The second county may charge its annual permit fee but not a plan review or inspection fee. Tacoma-Pierce publishes a Mobile Unit Plan Review Reciprocity Checklist for this, and King County publishes a Mobile Approval by Reciprocity Checklist.
- Do I need the L&I insignia before I apply for plan review?
- In King County, effectively yes: the Appendix B application lists the WA L&I sticker number as required information, and the packet says to get the L&I inspection and seal before plan review. Tacoma-Pierce is different: you can submit plan review first, but you must provide a photo of the L&I tag before final approval, and an occupied unit must be L&I-approved before TPCHD will do the pre-opening inspection. Either way, every occupied truck or trailer needs Labor & Industries approval.
Jackie Kotarba is a ServSafe Certified Instructor and Proctor licensed in all 50 states and a working health inspector who provides food manager certification and food-safety training. She brings 15+ years in hospitality — including running her own restaurant and launching the Chicago Pierogi Wagon food truck — to the permit and food-safety guidance on AutoFill PDFs.
Related guides
How to Calculate Food Cost for a Food Truck: Formulas, Yield and a Worked Example (2026)
The three food cost formulas a food truck needs (plate cost, food cost percentage and period cost of goods sold), a taco plate costed from BLS prices and USDA cooking yields, IRS benchmarks for what restaurants actually spend on food, and how to price a menu and an event from the result.
Food TrucksHow Much Do Food Trucks Make? Revenue, Profit Margin and Owner Pay from Census and IRS Data (2026)
What food trucks actually gross and keep, from the US Census Bureau's 2022 Economic Census and the IRS's 2023 sole proprietorship statistics, not the recycled $250,000–$500,000 claim. Revenue bands, profit margin, owner pay, and the fixed costs you can price before you open.